In addition to the redesign of the back room of the W20 student computing cluster, the cluster in 56-129 will be closing for renovations on June 9 and is scheduled to be reopened sometime in July. (See original article.)
Features of the 56-129 redesign include:
View image | View image |
56-129 before remodeling - June 2004 | 56-129 after remodeling - July 2004 |
Be part of this ongoing process of redesigns. Send feedback to cluster_improvements@mit.edu, or comment below!